Fluke DSP-2000 Manual do Utilizador Página 196

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 196
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 195
DSP-100,DSP-2000 Users Manual Supplement
7/00 5
On page 7-25, replace the wire map display at the top of the first column with
the following:
gc51i.eps
Wire map display showing a short
between pins 1 and 2.
Change #3
On page 6-1, under Calibrating the Test Tool add the following note:
Note
The test tool requires a traceable calibration once a year to make sure
that it meets or exceeds the published accuracy specifications. Send it to
an authorized Fluke service center for a complete traceable calibration
once a year.
On page 8-7, change Service Center Calibration Period,
To: Traceable Calibration Period
Change #4
On page 8-2, under Replacing the NiCad Battery Pack, add the following note:
Note
Do not use a NiMH battery pack in place of the NiCad battey pack. The
test tool will not charge properly with a NiMH battery pack.
Vista de página 195
1 2 ... 191 192 193 194 195 196

Comentários a estes Manuais

Sem comentários